Installation, sealing and protection accessories
Double-sided installation tape
Pressure-sensitive tape used for positioning, temporary fixing or auxiliary bonding of panels and trims; suitability depends on carrier, adhesive, substrate, load direction and mechanical retention.
Design options
Original AI material illustrations. Confirm colour, texture, substrate, bonding, edge details and suitability using physical samples and technical sheets.
01 Double-sided installation tape · Tape construction

02 Double-sided installation tape · Panel-back layout

03 Double-sided installation tape · Pressure application

04 Double-sided installation tape · Combined fixing node

Pressure-sensitive tape used for positioning, temporary fixing or auxiliary bonding of panels and trims; suitability depends on carrier, adhesive, substrate, load direction and mechanical retention. The gallery contains original AI concept illustrations, not physical samples, certificates or completed UBI projects. Confirm the selected product before ordering.
Material & technical notes
Characteristics
Review composition, section or layer build-up, dimensions, adhesive, substrate compatibility, joints and ageing evidence.
Colour direction
Confirm by approved physical sample
Grain & texture
Release liner, adhesive layers and foam or film carrier
Surface treatment
Approve the complete installed system by physical sample, mock-up and project specification.
Processing considerations
Sample approval, substrate preparation, dry fit, controlled application, joint treatment, inspection and maintenance record
Grade selection
Do not claim waterproofing, structural capacity, fire rating, permanent adhesion, safety compliance or service life without product- and system-specific evidence.
Care & maintenance
Keep clean, dry and protected before installation; follow the selected product documentation for preparation, curing, cleaning and replacement.
Specification to confirm
Confirm the exact material, thickness, geometry, adhesive system, substrates, installation conditions, test method, service environment and replacement plan.
Typical spaces to discuss
Kitchen · Bathroom · Living room · Hotel guestroom
Configuration & project checks
Colour direction
Confirm by approved physical sample
Surface treatment
Approve the complete installed system by physical sample, mock-up and project specification.
Continue your selection
Material & technical library
Product system
START WITH YOUR PROJECT
A drawing. A material.
A place you have in mind.
Bring a rendering, CAD drawing, BOQ, sample or reference image. We can start from the information you have.
Start a project
UBI


